Every CIDO client gets a private portal with the schedule, weekly reports, payments, test results and documents. Explore this sample project, or sign in to your own.
Sample project
4-bed duplex, Lekki Phase 1
62% complete · on schedule
Contract sum₦318.4mFixed scope, BOQ rev. 2
Paid to date₦206.9m65% across 4 milestones
Variations+₦2.1m1 approved by client
HandoverMar 2027Week 31 of 56
Schedule
- Design, approvals and soil testFeb to May 2026
- Foundation and ground slabJun to Jul 2026
- Ground floor frame and blockworkAug 2026
- First floor slab and roof structureNow
- Roofing, windows, services first fixNov to Dec 2026
- Finishes and second fixJan to Mar 2027
- Snagging and handoverMar 2027
This week on site
- First floor slab reinforcement inspected and signed off
- Slab pour booked for Thursday, 38 m³ ready-mix C25
- Roofing sheets delivered and checked against spec
Needs your decision
Choose window frame colour by 24 October to keep the aluminium order on time.
Live video walkthroughs can be booked any weekday, 8am to 6pm Lagos time.
| Milestone | Share | Amount | Evidence | Status |
|---|---|---|---|---|
| Mobilisation after approvals | 10% | ₦31.8m | Approval letters | Paid |
| Foundation and ground slab | 15% | ₦47.8m | Report wk 14, cube tests | Paid |
| Ground floor frame and blockwork | 20% | ₦63.7m | Report wk 22 | Paid |
| Upper floor and roof structure | 20% | ₦63.7m | Report wk 29 (part) | Paid |
| Roofing, windows, first fix | 15% | ₦47.8m | Due on inspection | Next |
| Finishes and second fix | 15% | ₦47.8m | Later | |
| Retention after defects period | 5% | ₦15.9m | Later |
| Test | Element | Target | Result | Status |
|---|---|---|---|---|
| Soil investigation (2 boreholes) | Site | Bearing ≥ 100 kN/m² | 140 kN/m² | Pass |
| Concrete cube, 28 days | Strip foundation | 25 N/mm² | 28.6 N/mm² | Pass |
| Concrete cube, 28 days | Ground floor columns | 25 N/mm² | 27.4 N/mm² | Pass |
| Rebar diameter check | First floor slab | Y12 at 150 c/c | As drawn | Pass |
| Slump test | First floor slab | 75 to 100 mm | Booked | Pending |
Approvals
Planning permit
Approved May 2026 · PDF
Drawings
Architectural set rev. C
24 sheets · PDF and DWG
Drawings
Structural set rev. B
18 sheets with calculations
Contract
Bill of quantities rev. 2
Signed March 2026
Land
Title verification note
C of O confirmed at land registry
Insurance
Contractor's all-risk policy
Valid to June 2027
Sample project with made-up figures. CIDO clients see their own project after signing in.